Service Process


Five steps from receiving the drawings to the finished model arriving on site. The deliverable and the dates for each step are written into a schedule before work starts, and each side keeps a copy.

Step 1 Requirements

1 to 2 working days. We confirm the display setting, the scale, the finished size and the budget range, and settle whether the model needs part splits, lighting and packing.

Step 2 Development and quote

3 to 5 working days. Development drawings and the part-split plan, with an itemised quote alongside; the quote covers materials, labour, lighting and packing, and excludes site installation and freight.

Step 3 Samples and sign-off

Samples are made first for the key materials and colours, the lighting is tested as a unit, and batch production starts once you sign off.

Step 4 Production and progress

Photographs from the same positions every week. Your team can inspect at the workshop at the key points; changes go through a change note.

Step 5 Packing and delivery

Split by transport unit, numbered and crated in wood, with an assembly drawing and a hardware list. Export jobs also get a packing list and customs documents.

Three commitments

The quoted price is the invoiced price, with nothing added unless you change the scope. If a date is at risk we say so before the contract, not before delivery. Drawings and project information stay private; where an NDA is needed, we sign it first.